Production Supervisor, 03999

June 2002 Resides in Ohio

Salary: US $Open

 

Relocate: Yes

 

On the Market: Cutbacks -

Industry: Aerospace - Automotive - Automation, Machine design, Tooling

 

Education:

1974 - 1976 ITT Technical Inst. Dayton, Ohio
Associates in Mechanical Engineering


Professional Experience:

March 2001 - March 2002 Aerospace, Ohio
Supervisor Production, 2nd Shift Production Supervisor of 18 individuals involved in varying aspects of manufacturing. Machinists, Electronic Technicians, and assembly workers. Assembly work varying from mechanical assembly to circuit board assembly. Machinist with various talents of ID, OD grinding, lathe and CNC.

Sept 1993 - Dec 2000 Delphi Chassis, Ohio
Supervisor Production,Manufacturing Eng., Supervisor Production, and Maint. PlannerI was on contract from Rapid Design to Delphi ChassisAug 99 to Dec 00 Maintenance Planner§ Tpm Implementation Program (Weekly shutdowns of machines for Preventive Maintenance). Have all materials at site and tasks pre-defined. We would generally shutdown as many as 3 per day.§ Support the Maintenance Supervisor with parts ordering; work load planning, daily and weekends.§ Ground floor activities in "Maximo" (Maintenance Software Planning Package) implementation§ Maintenance Supervisor - Weekends and absenteeism§ Involved in equipment breakdowns, expediting repairs, manpower, and parts availability and production requirements.

Dec 98 to Aug 99 -
Production Supervisor 3rd Shift· Production Supervisor 3rd shift· Supervised individuals running presses, headers, screw machines and other various production equipment.· Scheduled parts to run, quantities and changeovers.· Coordinated efforts involving Production, Maintenance and Engineering departments· Developed knowledge of the Union and how to react to certain situations· Involved in manpower problems, attendance and discipline

Sept 93 to Dec 98 -
Manufacturing Engineer· 1998 - Member of 5 Continuous Improvement Workshops· Dept # - Design and coordinated all proceedings to create a cell of 4 headers - where 1 man can run any 2 instead of 1 man per pair of machines. I coordinated all efforts from financial approval to supervision of outside contractors performing the work.· Designed and installed a new coining press to eliminate inconsistent parts.· Implemented a pantry storage system of over 500 different valves and to track production quantities with Production Control· Coordinated the re-control of machines to improve uptime and decrease maintenance calls · I was involved in all aspects of daily production floor support. From production volumes, equipment repair, new product tooling, replacement equipment parts, uptime and downtime, PM and cost improvements.· QS9000 experience in PPAP's, Control Plans and Equipment Operating Procedures

Silver Tool Inc June 91 to April 93·
I was a 1 man Engineering Department designing assembly fixtures and gages for the assembly of "Medical Operating Room" tools. I would handle the Quoting, Design, Purchasing, and Shop Manufacture of all devices.

Qsource Eng Inc.· Part of a team of designers that designed equipment to mass-produce Medical Operating Room tools.

Production Design Services Inc.· Mechanical equipment designer for Automotive assembly equipment.

Odawara Automation Inc.· Engineering Supervisor· Up to 10 Machine designers, detailers and checkers on various projects · Involved in all aspects of designing and building production machines to manufacture armatures and stators for the small motor industry.· We designed and built the equipment and therefore became involved in all aspects of construction debug, customer approval and installation

ITC Automation Inc· Engineering Supervisor· Up to 28 Machine Designers, detailers, and checkers on various projects· Involved in all aspects of quoting, designing and building production machines to manufacture components for the automotive and aircraft industry.· We designed and built the equipment and therefore became involved in all aspects of construction debug, customer approval and installation

Experience:

Since 1972 I have been involved with most facets of building production machines for various customers. I began with 2 years on the floor as an electriction then moved to electrical engineering. Here I began my knowledge of logic and needs of information a machine requires to function. I then began a Mechanical Machine Equipment Career around 1975 and graduated from ITT in 1976. Thru the 70,s and Mid 80,s I worked at various companies designing and building various machines. I had developed to a project leader status. In 1985 I became involved with ITC Automation and spent 3 Years as the Engineering Supervisor. I then progressed to Odawara Automation as their Engineering Supervisor. Odawara was a previous employer so I was interested in the opportunity. ITC was going out of business and to my dismay Odawara was sold 1 1/12 years later and I reverted back to Engineering again. Since 93 I have been building on my equipment and people experiences at Delphi Kettering by being a Manufacturing Engineer, Production Supervisor, Maintenance planner and Maintenance Supervisor.

I am fluent in Excel, Word and capable of understanding about any other type software.
I am also active on the Internet.
I have been involved with computers since the early 80's.Before 1993
I was fluent in AutoCAD at my previous engineering positions.




INQUIRE

Fee based candidate recruiting for LESS!