Overview of experience

A track record of outstanding technical performance in plant , project ,process and product management in sophisticated manufacturing environments. With diverse management  experience covering ,problem solving  , P&L responsibility, forecasting,  budgeting with financial accountability, capital equipment  selection ISO 900 implementation. quality and personnel training

 

Professional Experience

08/01/01 to Date : Independent Plastic Extrusion Consultant :            Self Employed

Consultant in Foaming and  Light weighting of plastic ,PS:PP:HDPE: PET and Lumber Composites, National and international experience .

 

Aug 1998 to 08/01/01          Manufacturing Manager /Process          (Company name) Products .MA

 

 Responsibilities: “ Plant Start Up” : installed , commissioned  and “processed in”  compounding extrusion  system  .Implemented, manufacturing ,  training and  testing  procedures. Responsible for process and screw configuration  , Select  equipment and design systems   for new  compounding lines .

 

Project  responsibility for “ Plant Start up”  on PET Foam sheet extrusion   working with PET suppliers /extruder / thermoformer manufactures and potential customers  to produce PET foam trays for the dual ovenable food market ( extruder process  exhibited at 2000  NPE  and 2000  Pack Expo show ) .

 

Process  responsibility for ” PP,HDPE  Extruded / lamination and co-extruded  Foam Sheet  production using  “CBA” and or “Atmospheric  Gases”  as blowing agent , using Flat die and   roll -stack configuration 

 

Accomplishments : Successful in increasing compounding  outputs by 50%  via process and  screw configuration . ( achieved  output 100% greater  than “Bayer” Germany  for same material )

Implementation of ISO900 program

Development of  PET Foam  sheet

 

Oct  1997 to Aug 1998          Product /Extrusion Engineering Manager      Sencorp. MA

Responsibility . For the custom design of Tandem Foam Extrusion Systems through a staff of 12 engineers ( electrical / software /mechanical / service) which including  turnkey installation nationally and internationally on  customer site .With total a project portfolio  responsibility of $16M a year

 Accomplishments . Successful in reducing on site “turnkey” installation  time by 50%

Successful in 10 %   cost reduction on major vendor components

Successfully completed from inception to commissioning  Extrusion  Lab Line In Rochester NY

 

Aug 1996 to Oct 1997.         Special Projects Manager                  Captive Plastics .NJ

Responsibilities .( 1 Year contact Position ) Project  coordinator  between Captive plastics and Quaker Oats in re-designing, incorporating  project management , plant layout , machine specification, installation , quality ,operator training  to final  production and acceptance  a range of Extrusion Blow Molded Bottles.   

 Reported  back to Board of directors  on monthly basis on project progress  ( $7M project )

Accomplishments: Completed project within the allocated budget and time

Named on Patent team

 

 

Dec 1995 to Aug 1996          Consultant/ Contractor                   Self Employed   Ohio

( Immigrated to USA in Dec 1995  )

Contracted by Battenfeld United Kingdom  to install PS Foam extrusion  ,reclaim system and supply process assistance in Egypt

Contracted By MGA Consultants to do contract managerial and process   work in Kuwait on PS foam installation .And investigate CFC to hydrocarbon conversion .

 

June 1992 to Dec 1995           Corporate Project  Manager                  Kohler Trays

Responsibilities .( Reporting to Board of directors )Initiating capital projects , feasibility studies for new foam plants, financial  budgeting , Selecting  project teams ,site selection , machine selection ,installation through to  production start up of Foam extrusion systems and thermoformers  ( A total of 5 PS  foam plant  Start ups .)

Accomplishments : Reduced product weight by 15% via extrusion hardware modification

Increased Extrusion output rates by 10% through  modified hardware

Increased Plant Utilization from 82% to 98% by the introduction of “Quality Management Techniques

Decreased Thermorfomer scrap rates from 32% to 10%

Reduced customer complaints from 30% to 0% in 7 months

Cost reduction program resulting in SAR 5M  saving in one year

 

May 1989 to June 1992         Director of  Capital Projects                Sunpack

Responsibilities ; (As for Kohler  Trays above ,  Sunpack was acquired by Kohler Trays )

Accomplishments ; Instrumental in setting up computerized  production and Quality system

Designed and installed  automatic material handling system to ensure consistent formulation to  foam extruders

Converted CFC PS plant to Hydrocarbon . 2 plants  ( first in southern Hemisphere )

3  year project  in developing co- extruded - foamed label material  with Sekisui Plastics , developed in  South Africa on completion  set up plant in  the USA . Project completed within scope , budget and timing ,

 

Oct 1986 to 1989        Director of  Production                         Sunpack

Responsibilities ;(Report to owners / directors ) Assure the economic and timely production of all products . Analyze monthly  data and market conditions , set production  forecasts order raw materials from overseas . Plant  maintenance , , finished goods , quality , Budgets , P&L and labor  training  responsibility

 

Jan 1982 to 1986        Plant Manager                             Van Leer

Responsibility :  As above for production Director )  responsible for Plastic converting , Foam ,Pulp and Metal Pressing plants total 650 employees

 

Jan 1978 to 1982       Plant Engineer                            Van Leer

Responsibility :  Assume the economic And timely Maintenance of all Production machinery through a maintenance team

 

Jan 1974 to 1978       Technical Assistant                             Van  Leer 

Responsibility : Technical Drawing  , mechanical design work .

 

 

Education

1982 “Industrial Administration Program “      ( Master Degree Program)          Cape Town University

1980  Management Development Program                             Stellenboch University

1978  Certificated Mechanical Engineer                           

1975 National Mechanical Diploma

 





INQUIRE HERE


Fee based candidates recruiting for LESS!

Jobwerx makes no representation as to the accuracy of information transmitted herein. 090602