 |

Rail
Transit Systems Engineer
04635
Industry:
Rail Vehicle - Transportation
Resides:
California
Salary:
Open
Relocate:
Yes
On
the Market:
I have over 25 years
experience in rail transit systems work including taking projects from
inception to implementation and acceptance by the user.
My technical, procurement and commercial background was gained through
the development of specifications and the management of over 20 systems
and services contracts which were invariably completed on time and within
the budget. The contracts were awarded using firm price bids and negotiated
procurements for both equipment and services. I also made presentations
to senior management, the board and members of the public in the course
of the work.
Systems
Engineering Manager and Senior Project Engineer with international experience
in rail systems design, construction, operation and maintenance. Managed the design, specifications, procurement,
installation, testing and commissioning of the following transportation
systems: passenger vehicles, SCADA, communications and central control,
fare collection, traction power, train control and signaling systems.
Experienced in operations and maintenance planning; design and
construction of new rail lines; upgrades to existing lines.
Supervised the development of specifications for the rehabilitation
of trains. Analyzed train motoring and braking performance.
Designed and tested train-borne control including automatic train
control systems, monitoring systems and verified interfaces and compatibility
with wayside signaling systems.
SUMMARY OF QUALIFICATIONS
- Over
twenty-five years of transportation experience with positions of progressively
increasing responsibility. Worked
both as a member of the owner staff and as a consultant.
- Recruited
staff, set up and led project teams.
Set goals and defined work scope and requirements; developed,
monitored and controlled the performance of the work to agreed budget
and schedule.
- Managed
and/or coordinated technical and support staff engaged in project and
procurement management, design, development, maintenance, applications
and product support.
- Assured
quality system design and its proper integration with other systems,
facilities, users and maintainers.
- Assured
compliance with specifications and regulations, and ensured user-friendly
documentation with proper training, and configuration control for operations
and maintenance staffs.
- Initiated
a lessons learned program.
·
Negotiated procurement and service contracts, and contract
changes; monitored implementation of developmental and production programs.
- Excellent
conceptual and analytical skills: creative - product design and enhancement.
Knowledgeable about advanced technologies related to transit.
- Experienced
in systems, electrical, electronic and mechanical engineering disciplines;
maintenance, the operational design requirements of maintenance and
control facilities; value engineering, and cost/benefit analysis.
- Worked
effectively as a team member with other departments, agencies and also
with regulatory agencies.
- Responsible
for equipment design, specification development, procurement, installation
and commissioning, and managed staff and consultant work.
- Worked
in the Public and Private Sectors both in the USA and abroad.
EXPERIENCE
December
1999 to date, Parsons Corp
October
2001 to date
Systems
Manager, Parsons UK
Technical
Manager for the systems work for London Underground Ltd. framework contract
and transportation related work in the London Office.
Identified teams for the work, prepared and reviewed responses
to customer enquiries and briefs, guided and reviewed systems work.
Supported development of specifications to upgrade block-jointed
track circuits to a Transmission-based Signal System for the Jubilee and
Northern Lines; defined interface and integration requirements and the
functional requirements for the service control center.
April 2000 to October 2001
Senior Project Manager for MARTA’s Rail Vehicle Consultants
(JV Company including Parsons)
Developed
and commenced implementation of the Metropolitan Atlanta Rapid Transit
Authority (MARTA) Rehabilitation and Life Cycle Maintenance Programs
Achievements
- Set
up a project team, with the appropriate skills, to address pressing
maintenance issues, particularly the immediate need for additional trains
to meet service for the North Line Extension.
- Our
staff gained access to the shop floor and worked alongside MARTA technicians,
in a strong unionized environment, trained and helped MARTA staff with
corrective (unscheduled) maintenance.
- Commenced
development of a Life Cycle Maintenance Plan, which included the writing
of procedures, logistics and training for preventative (routine) maintenance.
- Took
on additional work to develop the rehabilitation specifications for
a fleet of aluminum body cars built in the late 1970s and another fleet
of stainless steel body cars built in the mid 1980s.
- Supported
the procurement and implementation activities for this work.
December
1999 to March 2000
Principal
Systems Engineer on the East Side Access Project for New York MTA (Parsons
is responsible for Systems, Stations and Yard work)
Supported
the development of Project Work Plan for preliminary Engineering together
with resource-loaded schedules for the Long Island Railroad East Side
Access Project work. Helped develop
the concept of dependability for safety and reliability plans.
January
1998 to November 1999, Sound Transit, Seattle WA
Manager
of Systems / Chief Engineer in charge of Systems Division
Set
up the Systems Group and directed systems, yard and maintenance facility
work on two new light rail lines – one in Tacoma and the other in Seattle
against an aggressive schedule and to a fixed voter-approved budget.
Approximately $400 million was for the systems work.
Systems equipment comprised passenger vehicles, signaling, facilities
electrical, traction power and overhead contact system, communication
systems, remote monitoring and control and ticket vending.
Work also included operations and maintenance planning, managing
interfaces particularly with facilities and support for our first commuter
rail line particularly in the area of fare collection.
Achievements
- Recruited
a highly motivated team of outstanding and talented engineering staff
and co-located consultants.
- Supported
the environmental impact assessment work.
- Completed
the conceptual design and started preliminary engineering.
- Developed
work scopes and negotiated contracts for consultant services.
- Negotiated
contract for system-wide fare collection equipment and also for new
light rail vehicle vehicles for Tacoma.
1990
to 1998 Los Angeles County MTA
Project
Engineering Manager, Lead Systems Engineering Manager
Lead
Systems Engineering Manager for systems work on the Los Angeles Metro
Red Line and its extensions. Directed
Engineering Project Managers who managed multi-million dollar contracts
for design, procurement, installation, testing, commissioning of trains,
communications, traction power, facilities electrical, computer systems
for fire and emergency management, central control, signaling, automatic
train control and facilities mechanical and electrical equipment.
Achievements
- Led
a highly motivated team of MTA staff, design and construction management
consultants.
- Procured
systems approximately 30% under budget, through innovative contract
packaging.
- Designed
and implemented a turnkey fare collection system for the Metrolink Commuter
Rail System in less than eighteen months.
- Assured
standardization of equipment using procurements with multiple notices
to proceed to support staged line openings.
- Initiated
and encouraged novel approach to radio, and Transit Automatic Control
and SCADA systems design.
- Enhanced
the design of the traction power system.
- Prepared
specifications for vehicle and systems, including operational and maintenance
aspects, for proposed LAX to Palmdale Line turnkey project.
- Supported
RFP for consultant services, participated in proposal evaluation, and
consultant selection.
- Negotiated
consultant work scope and budget.
1983
to 1990 Southern California Rapid Transit District (SCRTD)
(Now
part of MTA), Metro Rail Project
Director
Facilities Engineering / Systems Engineering Manager responsible for
total value of contracts in excess of $100million.
Supervised project engineers on passenger vehicle, traction power,
fare collection and operational graphics contracts, managed design, procurement,
field installation, testing and commissioning activities.
1987
Project Engineer responsible for the Red Line Passenger Vehicle procurement;
negotiated technical and contractual aspects; managed design and procurement
consultant activities.
1983
Senior Engineer responsible for the development of the Passenger Vehicle,
Train Control and Communications specifications
Achievements
- Developed
Vehicle, Train Control and Communications Specifications.
- Successfully
completed a negotiated procurement for the Red Line Passenger Vehicles
- Contributed
to the development of operations and maintenance requirements and the
design of facilities.
- Developed
good working relations with potential contractors and peer authorities.
1979
to 1983 Eurotherm Ltd., West Sussex,
England
Applications
Manager and Senior Engineer
Set
up Applications Engineering Department. Provided applications support and product training
for instrument and thyristor product range; trained United Kingdom sales
force and overseas agents on the capabilities of the equipment and in
providing customer support for a newly introduced multi-loop microprocessor-based
temperature and process controller. Designed
a pre-programmed control system to automate a new, 1 MW, plasma discharge
furnace used in the nitride hardening and treatment of steels.
1967
to 1979 London Transport, London, England
Received
a thorough grounding in train performance calculation and testing in the
Traction Engineers Department. Supported the testing of the New Victoria Line
prior to its opening for passenger service and later helped with the maintenance
and testing of the Automatic Train Operation equipment. Designed and developed a number of solid state
control systems to update and replace older equipment on trains. Many of these items have since become standard
features on trains. Among these
items were motor-generator controls, multiplexed fault annunciation and
controls, automatic train driver box, automatic diagnostics and wheelslide
control. As the Engineering /
Project Manager in the Electronics and Traction Control sections was responsible
for two chopper- controlled test trains with several prototype sub systems.
Achievements
- Managed
design procurement and testing of two $1.5million experimental chopper
controlled trains. The work
included testing for signal system compatibility.
- Supervised
engineers involved in design, development of equipment for use on vehicles.
- Coordinated
projects to enhance control of vehicle subsystems.
- Performed
special studies for buses and energy storage schemes.
- Prepared
draft operating procedures manuals and rulebooks; trained instructors.
- Disclosed
my designs for a TDM fault annunciation system, wheel-slide protection
and speed sensing in the technical press.
- Assisted
in the testing before the opening of Victoria (transit) Line. Organized technical visits and exhibitions.
Industrial
Training at Isopad Ltd. (Surface Heaters) and at Murex Welding Processes,
England
TECHNICAL
PAPERS
New
Braking Schemes on London Transport Railways
Costing
Systems for Use in Design Work.
London
Transport’s “PRESTIGE” Private Finance Initiative Fare Collection Contract
APTA
papers on: Supervisory Control
and Data Acquisition System
Turnkey
Fare Collection Equipment Procurement
QUALIFICATIONS
- Professional
Electrical Engineer, California (by exam) and Washington State (by comity)
- Bachelor
of Science in Elec. Engineering, London Univ., England
- Master
of Technology in Electronics, Brunel University, England
- Diploma
in Management Studies (similar to MBA), Ealing School of Management,
England
- Certificates
qualifying me as a Professional Mechanical Engineer
- Chartered
Engineer - registered as a Professional Electrical Engineer and was
registered as a Professional Mechanical Engineer
- Fellow
of the Institute of Advancement of Engineering (USA)
INQUIRE
HERE

Fee based candidates recruiting for
LESS! 
Jobwerx
makes no representation as to the accuracy of information transmitted
herein. 111902
|
|
 |