 |

Supply
Chain Manager - Logistics- Materials Management
04698
Industry:
Manufacturing
Resides:
California
Salary:
Open
Relocate:
Yes
On
the Market:
OBJECTIVE
A position as a Procurement or Operations management
professional
SUMMARY
OF QUALIFICATIONS
Materials Management professional with twenty-five years of
progressive and diverse experience in Procurement, Inventory, Supply Chain,
Logistics, and Production Control Management, in challenging, diverse,
and dynamic environments. Extensive and progressive background in bringing
stability to troubled Purchasing, Logistics, Inventory Control, and Planning
Departments
Materials management programs and processes used and implemented
include DFT, VMI, JIT, Kan Ban, GMP, ISO, with limited exposure to FDA.
EXPERIENCE
ERP\MRP
- Project
Manager for implementation of Glovia ERP system on aggressive three-
month schedule at San Jose facility.
- Retrained system users on Glovia
system in Sylmar facility: reset system parameters for maximum utilization.
- Project
Manager for implementation of BAAN ERP System, in a Biotech environment.
- Cleaned up legacy data from QuickBooks
and Excel files, for transfer to Baan.
- Established standard cost, lead-time,
product structures, routers, unit of measure, and order policy for all
purchased items.
- Project
Manager for selection and implementation of MFG\Pro QAD ERP system.
- Leader of matrix team that established
hardware and software specifications. Cleaned up database in 3 legacy
systems for migration into QAD ERP system. Created task forces to focus
on and analyze tactical issues such as setups and procedures insuring
clarity for implementation.
- Conducted
training sessions and monitored progress of all users, which assured
effective transition.
- Project manager for implementation of Lawson ERP system,
Materials Management, and A/P suites. Duties included cleanup of legacy
system data, training of personnel, and conversion of data from Legacy
system to new ERP system. This was one of 36 Healthcare sites on schedule
for ERP deployment.
- Other ERP systems used and understood include MADIC,
MAPICS, Basic 4, Page Digital, AMAPS, Impact, AMS, and Expandable.
- Very
short learning curve for any unfamiliar ERP systems.
Purchasing Management
- Contracts management.
- Vendor audit and selection.
- Improved Vendor relations.
- Improved Cash Flow, due to scheduled
deliveries, and discounted terms when appropriate.
- Development
and training of staff.
- Cost
reduced machined part costs by 45% on flagship product.
Major negotiated contracts include
Lambda Physik, Beckman Coulter, Perkin Elmer, Kollmorgen, Hamilton Hallmark,
Arrow Electronics, Harris Tube, Alcoa, Flextronics, Rodenstock Lenses,
Coherent, MDC Vacuum Products, VAT, Varian, Fisher Scientific, Newport,
AT&T, Kent Landsberg.
Production Control Management
- Hands on Management.
- Viable
Production Planning.
- Spare
Parts Planning, including Forecast.
- Conversion of Forecast to Build Plan.
- Plan vs. Actual Analysis.
- Capacity Planning.
- Engineering Change effectivity management
- Development
and training of staff.
- New
Product Planning
Inventory Control Management
·
Increase in inventory accuracy from 65% to 99% in 3 months, with ultimate
elimination of physical count.
·
Dramatic improvement in
inventory levels and cycle count accuracy.
- Disposition
of obsolete material.
- Development
and training of staff.
Logistics Management
- Dramatic
reduction of Freight and packaging costs.
- On Time
Delivery to customer.
Supply Chain Management
- Reduction
of lead- time to customer.
- Significant
material and outside processing cost reductions.
- Implementation of Vendor Managed Inventory
programs.
- Implementation of Lean\DFT processes.
- Implementation of KanBan.
- Implementation of ISO 9002(Purchasing)
- Outsourcing of product to Contract manufacturing.
- Consigned materials management.
- Vendor audit and selection.
- Development
and training of staff.
Cost Management
- Problem
invoice reconciliation-significant reduction in volume of problem invoices.
- Cost Accounting.
- Significant reduction of WIP material
variances.
- Significant reduction of unfavorable
PPV.
Other Areas of Responsibility
- Creator of MRB group in several companies.
- Creator of Change Control Board in several
companies.
- “Change Agent” in all companies.
- Creator and Director of Recycling program
at two companies.
- Executive Staff member at four companies.
- Responsible for Physical Inventory at
five companies. Known for fast and accurate counts, and elimination
of Physical count at 3 companies, based on excellent Cycle Count results.
Industries
- Semiconductor Capital Equipment
- Semiconductor OEM products
- Passive Fiber Optic Products
- Weather Measuring Capital Equipment
- Telecom Diagnostic Equipment
- Soldering Equipment
- Automotive Consumer Products
- Passive Components
- Healthcare
- Biotech Reagents and Discreet Capital
Equipment
Commodities
- Sheet metal and machined parts
- Valves, process chambers, semi hardware
- Passive and active components
- Fiber optic components
- PCB’s
- Cables and Harnesses
- Castings
- Injection mold and die cast parts
- Wood Products
- Electronic Instruments
- Packaging
- Outside Processing
- MRO
- High Vacuum Systems
- Lasers
- Lab Products
- Computers and Controllers
- Hi Rel and Extended temperature products.
- Enclosures
- Towers
- Labor
- Clean Room items
- Facilities Items
WORK EXPERIENCE
Materials and ERP Implementation
Manager, Brooks Automation, San Jose, Sylmar, Valencia, CA
2/01 to 6/02
Global Supply Chain Manager, Tyco
Electronics, Menlo Park, CA
7/00 to 2/01
Director of Materials,
Metcal, Menlo Park, CA
1/00 to 7/00
Materials and ERP Implementation
Manager, Genetrace Systems, Alameda, CA
6/98 to 1/00
Materials and ERP Implementation
Manager, Palo Alto Medical Foundation, Palo Alto, CA
12/97 to 6/98
Materials Manager, Qualimetrics,
Sacramento, CA
9/94 to 12/97
Materials and ERP Implementation
Manager, Yakima Racks, Arcata, CA
4/90 to 11/93
Product Planning Manager,
Genus Systems, Mountain View, CA
2/84 to 4/90
Production Control Supervisor,
Sierra Electronics, Menlo Park, CA
9/80 to 2/84
Inventory Analyst, Beckman
Instruments, Fullerton, CA
8/78 to 7/79
Stores Lead, Centralab.
Glendale, CA
5/77 to 8/78
REFERENCES Available upon request
Summary: Materials Management professional with
progressive and diverse experience in Procurement, Contracts, Inventory,
Supply Chain, Planning, MRP, and Cost Management, in challenging, diverse,
and dynamic environments.
Materials management processes utilized include DFT,
VMI, JIT, Kan Ban, GMP, ISO, with some exposure to FDA. Extensive and
progressive background in bringing stability to troubled Materials Management
organizations, resulting in:
- Dramatic
improvement in inventory levels and cycle count accuracy.
- Dramatic
reduction of Freight and packaging costs.
- Significant
reduction of problem invoices.
- Accurate
costs.
- Accurate
system data.
- Reduction
of lead- time to customer. Increase in On Time Delivery.
- Disposition
of obsolete material.
- Significant
material and outside processing cost reductions.
- Viable
Production Plan.
- Development
of staff.
- Business
Re-Engineering.
- Documented
Procedures.
Proven negotiation skills with domestic and international
suppliers. Highly motivated, results oriented self- starter, with vision,
ability to be hands on, highly developed business sense, and the required
people skills to effectively develop a Materials Management team that
will meet and exceed the company’s business goals and expectations. Known
for excellent communication, negotiation, interpersonal skills, effective
management of materials, ERP\MRP system knowledge, training, analytical
skills, and problem solving. Interface
with Engineering, Manufacturing, Sales and Marketing, IT, Finance, and
Facilities.
Project Manager for implementation of QAD MFG\PRO, Baan,
Glovia, and Lawson ERP systems: past proficient user of several other
systems, including AMAPS, MAPICS, Basic4, Expandable, Impact, and MADIC.
Very short learning curve for any unfamiliar ERP systems
Professional Experience:
Brooks Automation, San Jose, Sylmar, and Valencia Ca. 2/01 to 6/02
Semiconductor capital equipment
Materials Manager, ERP Implementation Manager
Deployed Glovia ERP system on an aggressive three- month schedule. Cleaned
up legacy data prior to entry to new system. Business Re-Engineering,
Selected and qualified new higher quality, lower cost vendors, resulting
in reduction of fabricated part cost for primary product by 45%. Worked
on Transition team to transfer product to global manufacturing facility.
Developed staff in areas of competitive bidding, Cycle Count reconciliation,
Production Planning, vendor selection, outsourcing.
Reconciled over $2M in problem invoices.
Cleaned up MRB area: established guidelines for turnaround of discrepant
material to vendor.
Started Vendor Managed Inventory program for hardware items.
Member, MRB review Board, Executive Staff, CIP, and Change Control Board.
Set up Production lines for DFT\Lean manufacturing.
Purchasing Manager for Valencia and Sylmar, CA locations.
Performed Due Diligence Assessment for prospective acquisition.
Tyco Electronics, Fiber Optics Division, Menlo Park,
CA
7/00-2/01
Passive Fiber Optics
Global Supply Chain Manager
Hands on management of Purchasing, Materials and Production
Planning, Shipping, Receiving, and Stores functions.
Performed Global Supply Chain Management for facilities in Shanghai, India,
Taiwan, and Mexico, for production of FWDM, DWDM, BOA, switches, and other
Fiber Optic products. ISO 9002 team member.
Metcal, Menlo Park, CA
12/99-7/00
Desoldering equipment manufacturer
Director of Materials
Directed Purchasing, Planning, and Stores functions.
Managed international vendors in Sweden, Korea, Japan, China, and Germany,
including Contract manufacturers.
Brought stability to all areas of managed functions, established positive
relations with vendors.
Managed conversion of forecast to production plan, reduced in bound freight
costs.
Negotiated all contracts with Kan Ban suppliers. Retrained ERP system
users on Glovia ERP system: reset system parameters for maximum utilization.
In general, established a “make it happen” attitude within materials organization,
which resulted in exceeding company revenue plan by doubling outbound
shipments within 3 months.
Made the transition from reacting to planning, regarding availability
of material, and intelligent production planning.
Genetrace Systems, Alameda, CA
6/98-12/99
Startup Biotech- Reagents, and Mass Spec manufacturer
Materials Manager \BAAN System
Implementation Project Manager
Managed all facets of Materials Management in a start
up Biotech Company, including Purchasing, Planning, Production Control,
Shipping, Receiving, and Stores.
Project Manager for implementation of BAAN Enterprise Business System.
Established standard cost, lead-time, and order policy for all purchased
items, wrote SOP’s for Material Flow, Cycle Counting, and Physical Inventory.
Purchased all material requirements for discreet manufacturing requirements,
establishing standard costs and EOQ. Negotiated with suppliers on all
high cost items, crates, freight forwarding, and Service contracts for
OEM items.
Wrote Job Descriptions, and set goals for department staff. Planned all
MRP purchases for both reagent, and discreet manufacturing items.
Hands on management of most Materials related functions in ERP system,
with emphasis on development of staff to assume these responsibilities
in the near future.
Qualimetrics, Sacramento, CA
1994-1998
Manufacturer of weather measuring equipment
Materials Manager
Managed Purchasing, Production Control, Shipping, Receiving,
and Stores functions
Brought inventory levels in line, wrote report specs to retrieve necessary
information from system.
Trained personnel in areas of effective Materials Management, JIT concepts,
including Activity Based Management, vendor negotiation, effective Production
Planning, and MRP analysis and execution.
Authored MRB and Material Flow Procedure. Cleaned up two years of material
in MRB in three months, and $1M in E&O over a 6-month period. Wrote
job descriptions, and set developmental goals for department staff. Cleaned
up corrupted database. Reset costs over 15,000 purchased items, setting
new accurate standard costs. Created forecast for 1,500 catalog items,
which resulted in improvement of On-Time Delivery to customers from less
than 50% to 99%. Procurement of all material required from international
vendors. Reduced inbound freight costs by 40%. Negotiated long distance
carrier contract.
Eliminated several off line systems that were redundant to ERP system.
Created Cycle Count program; conducted inventory reconciliation training
classes for stockroom personnel, resulting in a accuracy rate jump from
54% to 98 % in 6 months.
Yakima Racks, Arcata, CA
1990
– 1993
Manufacturer and distributor of Roof Racks for Skis,
Bikes, Canoes, etc
Materials Manager, ERP Implementation Manager
Managed purchasing, Materials Planning, Inventory Management,
Receiving, and Stockroom functions.
Managed Master Production Schedule, inventory levels. Negotiated all major
purchasing contracts.
Trained Buyers in MRP and JIT concepts; Initiated competitive bidding
policy.
Trained manufacturing, shipping, and warehouse personnel in cycle count
and inventory reconciliation methods, resulting in improvement in inventory
accuracy from 65% to 99%, and elimination of physical count. Worked with
customers regarding logistics issues, product labeling, etc.
Reduced inventory value by 1/3 in 3 months resulting in the elimination
of 4 off site warehouses.
Created scrap recovery program with first year savings of $240K
Managed conversion of Forecast to Production plan process, resulting in
99% availability of all items ordered. Performed Plan vs. Actual analysis,
and made changes to MPS accordingly.
ERP Implementation
Manager Leader
of matrix team, which established hardware and software specifications,
for selection and implementation of new business computer system on aggressive
8-month schedule. Cleaned up data base in 3 legacy systems for migration
into QAD ERP system
Created task forces to focus on and analyze tactical
issues such as setups and procedures insuring clarity for implementation.
Conducted training sessions and monitored progress of all users, which
assured effective transition.
Genus Systems, Mountain View, CA 1984 – 1990
Manufacturer of Semiconductor Capital Equipment
Product Planning Manager
Responsible for Production, Materials, and Spares planning,
including support of Field Service, and in-house systems for semiconductor
capital equipment manufacturer
Managed Master Schedule, inventory levels and spare parts forecasts for
manufacturing and spares stockrooms.
Member of CCB, Design Review Board; and Chairman, MRB
Planned material and scheduled production of new products.
Held training classes in MRP, JIT concepts, effective Material and Production
Planning, writing Engineering Change Requests, and Cycle Count reconciliation
Created configured BOM's for special order equipment.
Set up spare parts work order system and stockroom. Established and documented operating procedures
for material flow.
Managed excess inventory.
Software Used
Outlook, Excel, Word, Access, Project, PowerPoint, QuickBooks,
Explorer
Professional Associations:
APICS (member since 1980)
Education:
Bachelors Degree Equivalent, Business Administration
INQUIRE
HERE

Fee based candidates recruiting for
LESS! 
Jobwerx
makes no representation as to the accuracy of information transmitted
herein. 121802
|
|
 |