 |

Project
Engineer
15651
Resides in Connecticut
Summary:
Experienced in design and control of complex industrial machinery.
Have designed and lay out of
control panels from 500 to 2000 IO points using AutoCAD. Have programmed
Ge Fanuc 9030, 9070, Genius, and Field IO. Experienced in programming
Allen Bradley 500 series PLCs, Series 5, Ac and Dc drives. Experienced
in design and lay out of drive cabinets using ABB, SSD, and Eurotherm
drives. Have designed Pentium based machine controls. Experienced
using Versa Pro 2.02 and Climplicty 5.5. 10 Years experience with Naval
Steam Boiler controls; including water level controls, flow controls,
and power generation.
Education: Bachelor of Science in Electronics
DeVry Institute of Technology,
Phoenix, AZ, October 1995
Associate of Applied Science
in Electronics
Ward Technical College, Hartford,
CT, June 1981
Military
Training: Naval Nuclear Power School,
Orlando, FL
Electronic Technician "A" School
Employment
Experience: Instrument and Controls Engineer
March 2002
Fuel Cell Energy, Danbury,Ct
April 2003
Programmed 9030 PLCs for control
of Fuel Cell Plants using Versa Pro 2.02.
Programmed Climplicty HMIs
using Climplicty 5.5. Designed control and Instrumentation Panels using
AutoCAD 2003.Devolped PLC subroutines from PID loop diagrams. Completed
training in Auto Desk Inventor 6.0. Reduction in staff due to work
slowdown
REF: George Bernsten
(203) 825-6022
Project Engineer
April 2001
Pratt Whitney Cenco, East Hartford,
Ct
November 2001
Designed control systems for
Jet Engine Test Cells. Designed control panels, drive cabinets, and PC
based controls. Used AutoCAD 14. Programmed Ge Fanuc
9030 Plcs and Hewlet Packard
9000 computer systems. Used high speed VXI A/D cards for data acquisition.
9/11 caused a slump in airline industry.
REF: Rich Pichollo
Universal Staffing
1-800-456-6695
Project Engineer
Feb 2000
Industrial Integrated Systems,
Yalesville, CT
April 2001
Designed layout of control
systems for rolling steel mills. Designed control panels, drive
cabinets, and PC based controls. Used AutoCAD 14. Programmed
GeFanuc 9070, and Allen Bradley PLC 500 systems. Worked with purchasing
agent and customer to devolved Control Panel Lay outs Laid off due to
Steel Industry decline
REF: Mark E. Ziff, PhD
Director of Electrical Engineering
(203) 265-5684
Contract Engineer
Nov 1998
Otis Elevator, Bloomfield,
CT
Sept 1999
Updated elevator control systems
design based on customer's needs. Completed a manufacturing package
and schematics using viewlogic.
REF: Summit Technical
Paul Thornton
(203) 272-6780
Design Engineer
July 1997
Jamieson Mfg., Torrington,
CT
Sept 1998
Electrical design and Automation
of customer machines, using lasers, servos, and Stepper drives to meet
customer's needs. Used Allen Bradley products, GE Fanuc and IDC
drives. Supplied customers with AutoCAD 12 schematics.
REF: Scott Jamieson
(860) 482-6543
Customer Service Engineer
Nov 1995
SVG Lithography, EFK, NY
May 1997
Serviced and maintained Micrascan
II photolithography equipment
Manufacturing Technician
Feb 1994
Intel, Chandler, AZ
Oct 1995
Student Coop engineering program
Field Service Technician
Nov 1991
American Sterilizer Company,
North East, Erie, PA
Jan 1993
Trained customers on new equipment
and installed new equipment
Maintained 60 Kw Electric Boilers
that supplied steam to Hospitals Aux steam loads, sterilizers and steam
washers. Maintained Steam and Gas Sterilizers.
Used Cutler Hammer Controls,
Babcock Wilcox, Magnetrol, and Ge controls.
United States Navy Electronics
Program
July 1981
Rank ET1(ss)/E6
June 1991
Senior Reactor operator in
charge of Reactor Controls, Boiler controls, and Radiation monitoring.
Electronic
Skills: Programming PLCs, Stepper drives, Servo drives, and Panelviews.
Experienced in using oscilloscopes, logic analyzers, and digital multimeters.
INQUIRE
HERE

Fee based candidates recruiting for
LESS! 
Jobwerx
makes no representation as to the accuracy of information transmitted
herein. 07/18/03
|
|
 |